- Today
- Holidays
- Birthdays
- Reminders
- Cities
- Atlanta
- Austin
- Baltimore
- Berwyn
- Beverly Hills
- Birmingham
- Boston
- Brooklyn
- Buffalo
- Charlotte
- Chicago
- Cincinnati
- Cleveland
- Columbus
- Dallas
- Denver
- Detroit
- Fort Worth
- Houston
- Indianapolis
- Knoxville
- Las Vegas
- Los Angeles
- Louisville
- Madison
- Memphis
- Miami
- Milwaukee
- Minneapolis
- Nashville
- New Orleans
- New York
- Omaha
- Orlando
- Philadelphia
- Phoenix
- Pittsburgh
- Portland
- Raleigh
- Richmond
- Rutherford
- Sacramento
- Salt Lake City
- San Antonio
- San Diego
- San Francisco
- San Jose
- Seattle
- Tampa
- Tucson
- Washington
Sharon Today
By the People, for the People
Bridge Replacement Underway in Sharon
Temporary road to be built during construction project expected to last until October.
Mar. 30, 2026 at 4:50pm
Got story updates? Submit your updates here. ›
A temporary road and traffic control measures will allow Sharon's bridge replacement project to proceed with minimal disruption to the local community.Sharon TodayThe project to replace the bridge that carries Route 718 over Pine Run in Sharon, Pennsylvania is scheduled to begin on Monday. A temporary road will be built for drivers while the work is being done, with traffic controlled by flaggers, which may cause delays in the area.
Why it matters
Bridge replacements are critical infrastructure projects that help maintain safe and efficient transportation routes for local communities. This particular bridge is an important connection in Sharon, and the temporary road and traffic control measures will help minimize disruptions during the construction period.
The details
The bridge replacement project on Route 718 over Pine Run in Sharon is expected to last until October. A temporary road will be built to allow traffic to flow through the area while the old bridge is demolished and a new one is constructed.
- The project is scheduled to start on Monday, March 31, 2026.
- The project is expected to be completed in October 2026.
The players
Route 718
The state highway that carries vehicle traffic over Pine Run in Sharon, Pennsylvania.
Pine Run
The waterway that flows under the bridge being replaced on Route 718 in Sharon.
What’s next
Drivers in the Sharon area should plan for potential delays and follow all traffic control measures during the bridge replacement project, which is expected to last until October 2026.
The takeaway
This bridge replacement project is a necessary infrastructure improvement that will help maintain safe and efficient transportation in Sharon, though it may cause some temporary disruptions for drivers during the construction period.

