- Today
- Holidays
- Birthdays
- Reminders
- Cities
- Atlanta
- Austin
- Baltimore
- Berwyn
- Beverly Hills
- Birmingham
- Boston
- Brooklyn
- Buffalo
- Charlotte
- Chicago
- Cincinnati
- Cleveland
- Columbus
- Dallas
- Denver
- Detroit
- Fort Worth
- Houston
- Indianapolis
- Knoxville
- Las Vegas
- Los Angeles
- Louisville
- Madison
- Memphis
- Miami
- Milwaukee
- Minneapolis
- Nashville
- New Orleans
- New York
- Omaha
- Orlando
- Philadelphia
- Phoenix
- Pittsburgh
- Portland
- Raleigh
- Richmond
- Rutherford
- Sacramento
- Salt Lake City
- San Antonio
- San Diego
- San Francisco
- San Jose
- Seattle
- Tampa
- Tucson
- Washington
Industry Today
By the People, for the People
PREMIER Completes 219,242-SF Class A Industrial Facility for Rexford in City of Industry
The new building offers modern specifications and sustainability features for warehouse and distribution users.
Mar. 3, 2026 at 11:23pm
Got story updates? Submit your updates here. ›
PREMIER Design + Build Group has delivered a new 219,242-square-foot Class A industrial facility for Rexford Industrial in the City of Industry, California. The project includes an 11,000-square-foot, two-story office component and features contemporary specifications like a 36-foot clear height, 21 dock-high doors, and an ESFR sprinkler system. Sustainability elements include a rooftop solar panel system.
Why it matters
This project reflects the ongoing demand for modern, efficient industrial space in Southern California to support the region’s warehouse and distribution needs. The facility’s design and sustainability features position it to meet the evolving requirements of industrial tenants focused on operational performance and environmental impact.
The details
The new building offers 219,242 square feet of industrial space with a 36-foot clear height, 21 dock-high doors, and a single grade-level load-in door. It includes an 11,000-square-foot, two-story office component with a modern design featuring expansive windows. The facility is equipped with an ESFR sprinkler system for enhanced fire protection, and it has a rooftop solar panel system to generate on-site renewable energy.
- The project was completed in March 2026.
The players
PREMIER Design + Build Group
A construction and design-build firm that collaborated with Rexford Industrial on the project.
Rexford Industrial
A real estate investment trust that owns the new industrial facility in the City of Industry.
Herdman Architecture + Design, Inc.
The architectural firm that contributed design services for the project.
The takeaway
The new Class A industrial facility developed by PREMIER and Rexford demonstrates how modern design, sustainability features, and operational efficiency can help meet the evolving needs of warehouse and distribution tenants in the Southern California market.